Shanghai Shunan Building Materials Co., Ltd.
Main products:inorganic insulation mortar,ceramic adhesive for floor,polymer anti-crack coating,concrete interface agent,putty for wall
Products
Contact Us
  • Contact Person : Ms. Chen Emily
  • Company Name : Shanghai Shunan Building Materials Co., Ltd.
  • Tel : 86-21-58041299-809
  • Fax : 86-21-58041300
  • Address : Shanghai,Pudong,No.68, Wanda Road, Wanxiang Industrial Park, Nanhui
  • Country/Region : China
  • Zip : 201313

Shunan All Purpose Powder Filler

Shunan All Purpose Powder Filler
Product Detailed
1.Will not shrink or crack 2.Can be painted after 24 hours 3.Can be screwed or nailed 4.Sets in 30 minutes.easy to rub down

Shunan SA824 All Purpose Water- Resistant Durable Filler 

For both interior and exterior use, with added PVA for extra strength. For repairs to plaster, brick, stone, wood, can be nailed or screwed when dry. Quick setting, non-shrink.

One component,preblended, cementitious outdoor wall plaster which, when mixed with water,is used prior to the application 

of finish coating,durable fillers,suitable for outside projects.Durable fillers,fill cracks and splits on exterior surfaces.

 product information

Packaging

      

· Weight: 25 kg

· Color: white

· Consumption: 1.5 ~ 2kg/m2

· Shelf life & storage: 6 months after manufacturing date in dry ventilated place

· Standard:JC/T157-2009

 Product advantages

   Easy to use, just mix it with water

· Excellent weather resistance

· Good application ability, easy to apply and polish

· Good water-resistant and water vapour transmission ability

· High adhesive strength

· Good match with substrate and finish coating

· ISO9001 quality management system

· Green building material certificate

 Field of application

· Suitable substrates: cement mortar, concrete

· Exterior for building 

 Limits of use

· Not suitable to use on oil substrate

· Not suitable to shrinkable substrate

 Consumption

1~2 kg/m2

 Product specification

 Application properties

Application temperature: 5°C~35°C

Pot life: 2hour

Water addition per 25kg bag: 8~9liters

 tools:

Elec-mixer,Bucket,Trowel

 substrate preparation

· Clean the substrate until free from dust, oil, or any other stains

· When high temperature season or dry substrate, substrate should be wet one day before

 Application

                            

· Put 8~9 liters clean water in a bucket. Gradually add one bag (25 kg) of powder into water

· Mix properly until homogeneous and lump-free

· Leave the product for 5~10 minutes. Then mix the second time for 1~2 minutes

· Apply the 1st coat of product onto the substrate. When the finish is dry, apply the 2nd coat.  Each thickness is about 

  0.5~0.6 mm

· Ensure a flat, smooth and pinhole free coating

· Normally, after 24 hours (depend on weather and substrate), polish the surface

· After that, apply the finish coating

 Application environment

· Temperature: 5°C~35°C

· Avoid rain, high temperature and frost

· Avoid direct sunlight or strong wind

 safety

· May cause serious damage to eyes

· May be sensitive to skin in case of contact. lrritable for eyes, respiratory system and skin

· Keep out of the reach of children

· Avoid breathing the dust

· In case of contact with eyes,rinse eyes immediately with plenty of water and consult a doctor

· Wear suitable protective clothing,gloves and eye/face protection

Shunan All Purpose Powder Filler



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.